The installation team has completed phase one of BC year 2 installation. Nine new stations were installed and all old stations were serviced. Another four new stations will be installed over the next few weeks.

 

#
Station Date (2002) Time, UT Activity Libra Digitizer Seismometer Comments
1
P20T November 9 23:45 Started new station at Harrison Lake South (HLSB) CYG217 TRD078 CMG-3ESP T3D78 Teams: Issam Al-Khoubbi, Kadircan Aktas, Mike Patten and Tom Christie. First of BC stations. Powered by AC. X-pol 1, Co-pol 35 dB.
2
HLSB November 10 19:00 P20T changed to HLSB. CYG217 TRD078 T3D78 Disitizer sensitivity set at 0.1
3
P55T November 12 00:21 Started new station at Harrison Mills (HRMB) CYG285 TRD296 T3D82 X-pol 0, co-pol 28 dB. DC site. Will be fenced.
4
HRMB November 12 02:35 P55T changed to HRMB CYG285 TRD296 T3D82  
5
P53T November 14 22:45 Started new station at Pitt Meadows (PIMB) CYG283 TRD293 T3E05 X-pol 0, co-pol 32 dB. DC site. Bedrock seismometer. Software gain 0.1. Rained a lot during installation. Batteries from last year had low volts.
6
PIMB November 14 23:05 P53T changed to PIMB CYG283 TRD293 T3E05  
7
P51T November 16 23:37 Started new station at Cleveland Dam (CLVB) CYG277 TRD276 T3D95 X-pol 0, Co-pol 30 dB. DC site. Clay ground. Sun coverage is average. GPS does not have full coverage. Libra 5.31, Ts 121, Tr 1.54. Gain 0.1. Waveform signal from seismometer looks a little odd.
8
CLVB November 17 18:50 P51T changed to CLVB CYG277 TRD276 T3D95  
9
P32T November 18 18:00 Started new station at Anmore (ANMB) CYG254 TRD245 T3D85 X-pol 0, Co-pol 29 dB. AC site. Clay soil. Gain 0.1.
10
ANMB November 18 19:35 P32T changed to ANMB CYG254 TRD245 T3D85 Teams moving to V. Island.
11
P49T November 20 22:00 Started new station at Timber West Koksilah (TWKB) CYG273 TRD070 T3D91 X-pol 3, Co-pol 33 dB. DC site. Loggin area with many small trees and logging roads near by with a few trucks daily. Software gain 0.1 DC filter on at 0.001.
12
TWKB November 20 23:30 P49T changed to TWKB CYG273 TRD070 T3D91 KA to leave on Nov. 21. The rest of the team to re-organize and service old BC stations before installing more new ones.
13
P50T November 25 18:50 Started new station at Timber West Granite (TWGB) CYG262 TRD269 T3D80 X-pol 1, Co-pol 25 dB. Bedrock site. DC site. All new firmware 5.41, 1.22, 1602, 123. old firmware on other part. Gain 0.1 DC filter on at 0.001. Seismo vault was difficult, elevated. by 3 m. Calling from SAT phone (no Cell coverage).
14
TWGB November 25 19:44 P50T changed to TWGB CYG262 TRD269 T3D80 Next site TWBB.
15
P56T November 27 00:10 Started new station at Timber West Blakeney (TWBB) CYG177 TRD256 T3E02 X-Pol 1, Co-pol 29 dB. DC site. All 6 batteries reused. Many trees near site. Seismomter vault on gravel away from the dish. No fence. All new firmware installed. Gain is 0.1 DC filter on at 0.001. Calling from SAT phone.
16
TWBB November 27   P56T changed to TWBB CYG177 TRD256 T3E02 Next site Salt Spring Island.
17
P57T December 4 17:30 Started new station at Salt Spring Island (SSIB) CYG271 TRD083 T3D79 Trouble with Lan port on PC waisted hours with panic calls all around. This resulted in a 4 days delay. X-pol 0, Co-pol 26 dB. Pier installed in dirt close to bedrock. All new firmeare (5.41/1.22/1.622/1.23). No report of gain setting at the time but later confirmed gain was at 0.1 with DC removal on at 0.001.
18
SSIB

December 4

17:30 P57T changed to SSIB CYG271 TRD083 T3D79 This is the end of this installation phase. IAK is planning to service CLVB and replace the discharged batteries. He may visit COQB and KELB to fix firmware bug.
19
CLVB

December 5

21:45 Battery swap. CYG277 TRD276 T3D95 Service visit to replace all six battereis with new ones. Firmware upgrade to 5.41/1.22/1.622/1.23. Gain check 0.1 DC removal check 0.001 and on.